Venice Avenue Bridge re-opens after being closed down due to inspection

Venice Avenue Bridge re-opens after being closed down due to inspection
Venice Avenue Bridge re-opens after being closed down due to inspection (Source: City of Venice)

VENICE, Fla. (WWSB) - The Venice Avenue Bridge has re-opened after being closed down earlier on Saturday afternoon.

Representatives in the City of Venice are telling ABC7 that this was due to a police inspection in the area.

Police say a truck with heavy construction equipment hit the underside of the bridge on the mainland side and this forced concrete to be removed from the structure at East Venice Avenue and Seaboard Avenue.

No injuries were reported.

Copyright 2020 WWSB. All rights reserved.